Tuesday - December 23, 2008

gen updates

12.23 - 3 new sites at Break Away Directory.

Filed under: general updates — Sarah @ 10:14 pm

why won’t it all paint itself

So I got my computer. I meant to post as soon as I got it, but you know me.

I don’t have it set up yet. It doesn’t fit in the current desk and I don’t want it sitting on the floor. Too hazardous. I did unpack it for a quickie to make sure everything appeared to be running OK. Man is it huge. I’m sure you are dying to hear the specs. No? Well here they are anyway:

- HP Pavilion Elite d5100t ATX PC
- Genuine Windows Vista Ultimate with Service Pack 1 (64-bit)
- Intel(R) Core(TM) 2 Quad processor Q9300 (2.5GHz)
- 4GB DDR2-800MHz dual channel SDRAM (4×1024)
- 1GB NVIDIA GeForce 9800GT, 2 DVI, HDMI adapter
- 750GB 7200 rpm SATA 3Gb/s hard drive
- LAN port on system board (10/100/1000Base-T)
- LightScribe 16X max. DVD+/-R/RW SuperMulti drive
- Creative Sound Blaster X-Fi Titanium
- Logitech X-530 speakers (5.1)

Loooooove it! Now, to put things in perspective, lets look at my old/current PC specs shall we?

- Sony Vaio RZ14G
- Windows XP Home Edition
- 2.53 GHz Intel Pentium 4
- 512 MB PC2100 DDR-SDRAM
- 64 MB NVIDIA GeForce4 MX 440
- 120 GB ATA-100 7200 RPM
- LAN port on system board
- DVD-RW Drive (8x max, CD-R write, 1x max, CD-RW write, 2x max, DVD-R write, 1x max, DVD-RW write)
- CD-ROM Drive (40x max)
- 3.5 Floppy Disk Drive
- Yamaha YMF-753 audio

It’s pathetic. It is 6 years old after all. For gods sake it has a floppy drive! Which was mostly obsolete even at that time.

Oh well. I’m trying my damnedest to get the upstairs done so I can use my new PC. Between work and everything it will be a slow process, but I will get it done damn it. The bathroom is already done. I did that quite a while ago. Back when I was still hoping we would hire professionals to do the whole shabang. Then I realized I would be waiting forever for that. I got my tendency to procrastinate from my mom and she’s a pro. But I want to get this shit done. So I decided to go room by room.

To back up a bit and lay it all out… We’re swapping floors. She has a her bedroom and 2 sewing rooms upstairs plus the afore mentioned bathroom. I have a bedroom and sewing room on the downstairs. So I’m going to of course have my bedroom and sewing room and then the third room will become my tv/computer room. The downstairs will be transformed into her own sewing heaven. It was decided that we don’t need a living room and dining room. So those two rooms will become her new sewing rooms. What was my bedroom and sewing rooms will become her bedroom and a storage room. We’d really like to sell things on Etsy.com. And once this is done, we really won’t have any excuses (although you can always find new ones!).

So other than the bathroom I got the closet done in what will become my new bedroom. Today I’m going to move some of the extra crap out of the room and begin washing the walls and chip away at a water damaged part of the ceiling. (A couple years ago we got a leak in that room that turned out to be caused by a bullet hole. We are guessing some shmuck shot a few off on the most recent 4th of July and the leak wasn’t noticed until the first big rain since.) If my mom wasn’t a smoker the washing of the walls wouldn’t necessarily be absolutely required. But she is, so I must. I’m still not sure how I’m going to patch the water damaged area… The bathroom is super cute though. Perhaps I’ll take pictures.

Maybe in between that today and after christmas I’ll work on a new layout here.

Filed under: Personal — Sarah @ 11:26 am

Next Page »